Everyone has their own dreams. What is your dream? Is it a promotion, a raise or so? My dream is to pass the EMC E20-017 exam. I think with this certification, all the problems will not be a problem. However, to pass this certification is a bit difficult. But it does not matter, because I chose ITCertKing's EMC E20-017 exam training materials. It can help me realize my dream. If you also have a IT dream, quickly put it into reality. Select ITCertKing's EMC E20-017 exam training materials, and it is absolutely trustworthy.

ITCertKing is website that can take you access to the road of success. ITCertKing can provide the quickly passing EMC certification E20-017 exam training materials for you, which enable you to grasp the knowledge of the certification exam within a short period of time, and pass EMC certification E20-017 exam for only one-time.

Exam Code: E20-017
Exam Name: EMC (Information Availability Design Specialist Exam for Data Center Architects)
One year free update, No help, Full refund!
Total Q&A: 108 Questions and Answers
Last Update: 2013-10-02

All the IT professionals are familiar with the EMC E20-017 exam. And all of you dream of owning the most demanding certification. So that you can get the career you want, and can achieve your dreams. With ITCertKing's EMC E20-017 exam training materials, you can get what you want.

If you choose the help of ITCertKing, we will spare no effort to help you pass the exam. Moreover, we also provide you with a year of free after-sales service to update the exam practice questions and answers. Do not hesitate! Please select ITCertKing, it will be the best guarantee for you to pass E20-017 certification exam. Now please add ITCertKing to your shopping cart.

ITCertKing is a website which can give much convenience and meet the needs and achieve dreams for many people participating IT certification exams. If you are still worrying about passing some IT certification exams, please choose ITCertKing to help you. ITCertKing can make you feel at ease, because we have a lot of IT certification exam related training materials with high quality, coverage of the outline and pertinence, too, which will bring you a lot of help. You won't regret to choose ITCertKing, it can help you build your dream career.

E20-017 Free Demo Download: http://www.itcertking.com/E20-017_exam.html

NO.1 In which focus area of the Information Availability Design Framework can seamless movement of data
between tiers of storage be found?
A. Automate
B. Create Copies
C. Distribute
D. Store
Answer: A

EMC questions   E20-017 exam   E20-017 answers real questions   E20-017 questions   E20-017 exam

NO.2 Based on strategic plans regarding green initiatives, an IT department is considering server
consolidation in its data centers.
Which set of elements should be included in the business value analysis to maximize the ROI for such an
initiative?
A. Asset utilization, recovery of stranded assets, and cost of floor space and power
B. Productivity of staff, response to business conditions, and utilization of storage
C. Asset utilization, backup costs, and need for availability
D. Cost of floor space and power, FTE-managed TB of storage, and reduction in SLA penalties
Answer: A

EMC exam dumps   E20-017   E20-017   E20-017

NO.3 As represented in the exhibit, a company has a system with three critical components. Each component
must be functioning for the system to be operational.
What is the scheduled availability (percentage) for the system?
A. 84
B. 86
C. 88
D. 90
Answer: C

EMC   E20-017   E20-017   E20-017   E20-017   E20-017

NO.4 In which focus area of the Information Availability Design Framework can platform integrity be found?
A. Store
B. Automate
C. Create copies
D. Distribute
Answer: A

EMC   E20-017   E20-017   E20-017 study guide

NO.5 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $50,000 for the implementation charges.
Once the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $70,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 85%; Month 8
B. 85%; Month 9
C. 110%; Month 6
D. 110%; Month 8
Answer: C

EMC   E20-017 dumps   E20-017   E20-017 test   E20-017 certification

NO.6 The exhibit represents the expected financial results of a storage technology investment.
What does the ® ¯: represent?
A. Cost of investment equals the gain from the investment
B. Asset exceeds liability
C. Deployment cost crosses the planned deployment time
D. Return on investment
Answer: A

EMC   E20-017   E20-017   E20-017 test answers

NO.7 In the context of "establishing information availability," what is an operation management activity?
A. Capacity planning
B. Data classification
C. Testing
D. Implementation planning
Answer: A

EMC   E20-017 study guide   E20-017 test   E20-017   E20-017

NO.8 A company's IT department is comparing two technology proposals. Option 1 would retain legacy
equipment while Option 2 would replace the existing equipment with a new one.
Option 1:
-Total operation costs = $400,000 per year -Annual storage requirements = $100,000 per year
Option 2:
-Initial investment = $1,250,000 -Recurring annual operation costs = $150,000 per year -Annual storage
requirements = $100,000 per year
The company's write-off costs for the legacy equipment is $50,000. As a business analyst using a TCO
analysis, which option would you recommend?
A. Option 1 is feasible if the project lifespan is less than 5 years
B. Option 1 is feasible if the project lifespan is more than 6 years
C. Options 1 and 2 are feasible if the project lifespan is 5 years
D. Option 2 is feasible if the project lifespan is less than 5 years
Answer: A

EMC test   E20-017 test questions   E20-017   E20-017 original questions

NO.9 The exhibit represents a Component Failure Impact Analysis (CFIA) for a company's IT infrastructure.
Several Requests for Change (RFC) were raised.
Which RFC should be considered a priority for implementation?
A. Deploying a switch architecture with no single point of failure
B. Clustering the backup server with multiple storage devices
C. Configuring the NAS device in an active-active mode
D. Adding more disk drives to the storage array
Answer: A

EMC   E20-017 practice test   E20-017 practice test   E20-017   E20-017

NO.10 A company has estimated a cost of $220,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $30,000 per month. In addition, the
company has agreed to spend $1,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC   E20-017   E20-017 exam dumps   E20-017 practice test   E20-017 certification

NO.11 A company has a system with three critical components as represented in the exhibit.
Each component must be functioning for the system to be operational. Following an outage, certain
components seem to take longer to restore back to service than others.
What is the mean time to repair (MTTR) for Component 3?
A. 2 hours
B. 3 hours
C. 5 hours
D. 10 hours
Answer: C

EMC   E20-017   E20-017 exam prep   E20-017 exam dumps

NO.12 As represented in the exhibit, a company has a system with three critical components.
Each component must be functioning for the system to be operational. SLAs have been established
between the business and IT that define normal hours of operations for service as 8 A.M. - 8 P.M.,
Monday through Friday.
What is the availability (percentage) of Component 1?
A. 78
B. 81.7
C. 89
D. 91.7
Answer: B

EMC braindump   E20-017 answers real questions   E20-017 exam simulations   E20-017   E20-017 answers real questions   E20-017

NO.13 A company has a shared pre-staged infrastructure at an alternate site. This approach enables the
company to rebuild systems and applications in the event of a disaster.
What is the term for this strategy?
A. Hot site
B. Manual failover site
C. Cold site
D. Warm site
Answer: A

EMC   E20-017 answers real questions   E20-017   E20-017 test questions   E20-017

NO.14 A company has estimated a cost of $240,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $35,000 per month. In addition, the
company has agreed to spend $2,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC   E20-017 questions   E20-017 test

NO.15 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $60,000 for the implementation charges. Once
the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $60,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 35%; Month 6
B. 35%; Month 7
C. 76%; Month 6
D. 76%; Month 7
Answer: D

EMC certification   E20-017 dumps   E20-017 exam dumps   E20-017

ITCertKing offer the latest LOT-442 exam material and high-quality E20-891 pdf questions & answers. Our 700-505 VCE testing engine and 200-001 study guide can help you pass the real exam. High-quality 000-781 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.